Frequently Asked Questions

Project Basics

The Lexington High School Building Project is an effort, already several years in the making, to significantly repair and enlarge or fully replace the existing LHS. The current structure no longer meets our educational needs due to failing infrastructure and overcrowding in classrooms and common spaces. In November 2024, the School Building Committee (SBC) selected massing study C.5b, or Bloom, as their preferred design.

The vision for the Lexington High School Building Project is to create a modern, flexible learning environment that supports 21st-century educational goals. Through extensive community engagement and collaboration with educational experts, the project aims to address both current and future needs of students and staff. Sustainability and accessibility are central considerations, with plans to incorporate energy-efficient systems and inclusive spaces throughout the new facility.

Last updated on Wednesday, September 24, 2025

Project Cost

A breakdown of the estimated cost of building a new lexington high school, before and after rebates and reimbursements; the projected construction timeline and number of phases necessary; the proposed location of the new high school.

The School Building Committee (SBC) selected massing study C.5b, or Bloom, as their preferred design. The SBC submitted this design to the Massachusetts School Building Authority (MSBA) as part of the Preferred Schematic Report on December 9, 2024. On February 26, 2025, the MSBA approved the Town’s PSR submission, advancing the project in Module 4: Schematic Design. The SBC then voted to approve and submit the Schematic Design on August 18th, 2025.

The estimated project cost of the Bloom design is $659 million. This estimation encompasses the school, a renovated & addition field house, and the inclusion of the Central Administration Offices inside the building.

The project team recognizes how significant this project's price tag is; they want to underscore the high cost of doing nothing.

Last updated on Tuesday October 7, 2025.

Project Design

A three-dimensional rendering of the proposed Bloom design for a new Lexington High School

The project design encompasses the logistics of location, construction, and the overall timeline of the project.

On Wednesday, February 26, 2025, the Massachusetts School Building Authority (MSBA) approved the Town of Lexington’s Preferred Schematic Report submission. As of that date, the Project is in Module 4: Schematic Design, the Project Team submitted the Schematic Design Package to the MSBA on August 28th. 2025 after it was approved by the School Building Committee on August 18th, 2025.

Last updated on: Wednesday, September 24, 2025

Project Team

The Project Team is an umbrella term used to describe any individual or group who is playing a direct role in the project. However, this term does not encompass every individual, group, or organization involved.

Last updated on Wednesday, February 26, 2025

Additional FAQs

The following questions and associated answers address more specific elements of the project.

Last updated on: Wednesday, November 13, 2024

The information provided on this page is representative of what is currently known. Additions and edits will be made as the project develops. Some questions may be listed without corresponding answers—these are questions we have received from the community that we are actively working to answer.

Do you have a question you don’t see here? Email the School Building Committee!